Skip Navigation Links.
Collapse Knowledge BaseKnowledge Base
Expand Validation ApproachValidation Approach
Expand RegulationsRegulations
Expand Periodic AssessmentPeriodic Assessment
Expand Risk AnalysisRisk Analysis
Expand Facilities and HVAC SystemFacilities and HVAC System
Collapse Equipment ValidationEquipment Validation
Expand Analytical Instruments (AI)Analytical Instruments (AI)
Expand SterilizationSterilization
Expand Depyrogenation and EndotoxinsDepyrogenation and Endotoxins
Expand Utility SystemsUtility Systems
Expand Packaging and Shipping ValidationPackaging and Shipping Validation
Expand Cleaning Validation / Efficacy StudyCleaning Validation / Efficacy Study
Expand Computerized SystemsComputerized Systems
Expand Process ValidationProcess Validation

A Requalification Program Overview

A requalification program for processes, equipment, and utility systems is a systematic approach to ensure that these components continue to meet the required standards and specifications after their initial qualification or validation. Requalification is necessary to maintain the quality, safety, and compliance of manufacturing and production processes.

Triggers for Requalification:

  • Requalification can be triggered by various factors, including:

    • Change Events: Any significant change to the equipment, process, or utility system that could potentially impact its performance or regulatory compliance should trigger a requalification. This might include changes in equipment design, equipment relocation, operating parameters changes, identification of negative trends in quality indicators, or critical components.
    • Periodic Assessment: Regular assessments, as part of ongoing quality and compliance practices, may identify performance deviations, wear and tear, or drift from specifications that necessitate requalification. These assessments may uncover issues such as equipment wear, performance deviations, or evolving regulatory requirements, prompting the need for requalification.
    • Regulatory Requirements: Changes in regulatory guidelines or requirements can also trigger the need for requalification.

Components Included in Requalification:

  • Requalification typically involves a reassessment of the following components:
    • Equipment: This includes a review of the equipment's functionality, calibration, and maintenance records.
    • Processes: For process requalification, it's essential to validate that the process parameters, raw materials, and control systems are still capable of consistently producing products that meet quality and regulatory standards.
    • Utility Systems: Utility systems, such as HVAC, water purification, and compressed air, are critical to manufacturing environments. Requalification ensures that these systems continue to operate as intended, providing the required environmental conditions and utilities.

Requalification Activities:

  1. Documentation Review: Review and update all relevant documentation, encompassing standard operating procedures (SOPs), validation protocols, equipment manuals, maintenance logs, calibration records, and change control documentation, to ensure that they reflect current standards and specifications.
  2. Calibration Verification: Verify that all instruments and measuring devices are calibrated and functioning within specified tolerances. Calibrate equipment as necessary to maintain accuracy.
  3. Maintenance Assessment: Assess the effectiveness of the maintenance program, confirming that maintenance activities are carried out as per schedule. Address any identified maintenance issues promptly to prevent equipment or system failures.
  4. Change Control Assessment: Review all changes made to equipment, processes, or systems since the last qualification. Ensure that changes are properly documented, justified, and validated, if required.
  5. Functional Testing: Perform functional testing of equipment to ensure that it operates according to its intended design and specifications. Verify that control systems, alarms, and safety features are functioning as expected.
  6. Performance Qualification (PQ): Conduct PQ tests to verify that the process consistently produces products that meet quality and regulatory standards. Ensure that process parameters, raw materials, and control systems are in compliance.
  7. Additional Testing: Conduct any necessary additional testing, which may not always be applicable and depends on specific circumstances. Such testing includes stress testing, load testing, or other specialized tests and is typically required due to significant changes, deviations, or evolving regulations. Additionally, perform temperature mapping studies to ensure uniform temperature distribution within equipment, especially in critical storage or manufacturing areas, while verifying that temperature-controlled environments meet specified requirements. Furthermore, conduct environmental testing, encompassing air quality testing, particle monitoring, and microbial testing, to ensure the suitability of the manufacturing environment for intended processes and confirm the effective functioning of environmental control systems. Please note that the need for these additional tests should be determined based on specific conditions and risks associated with the equipment, systems, or processes involved.
  8. Risk Assessment: Conduct a risk assessment to identify potential hazards and risks associated with changes or deviations. Implement risk mitigation strategies as needed.
  9. Regulatory Compliance Review: Review and update compliance documentation to ensure alignment with current regulatory requirements. Address any regulatory changes that may impact the qualification status.
  10. Data Integrity Assessment: Ensure data integrity by reviewing data records and documentation to prevent data manipulation, loss, or unauthorized access.
  11. Training and Personnel Qualification: Verify that personnel involved in operating and maintaining equipment and processes are adequately trained and qualified. Assess training records and qualifications.
  12. Audit and Inspection Readiness: Prepare for potential regulatory inspections by ensuring that all documentation and records are complete, accurate, and readily accessible.
  13. Verification of Validation Protocols: Confirm that the validation protocols in place are still relevant and effective. Update validation protocols as needed to reflect changes in processes or equipment.
  14. Review of Log Books and Records: Review log books and associated records for equipment and utility systems to identify any trends, anomalies, or deviations. Address any issues identified during the review.
  15. Assessment of Vendor and Supplier Qualifications: Ensure that vendor and supplier qualifications and performance remain satisfactory, especially for critical components and materials.

Frequency of Requalification:

The frequency of requalification activities should be determined based on the risk assessment, industry standards, regulatory requirements, and the criticality of the equipment, processes, or systems involved. Regular and thorough requalification efforts are essential to maintain product quality, safety, and regulatory compliance in manufacturing and production environments. Common requalification intervals may vary from every one to three years or even longer for less critical systems. Critical equipment and systems may require more frequent requalification.